I agree to receive news and promotional information from CNC Electric and its affiliates via email.
YC Panel Meter
YC Panel Meter
1.To prevent electric shock,the power must be off when wiring isto be carried out
2.Wiring shall be arranged directly according to ports. Please confirm whether allconnections are correct.
3.Use drag steering.
4.To reduce electromagnetic interference to electrical wires,
equipment and wires shall be connected in suitable range with same size for shortest connection.
5.Wiring layout shall be away from any internal electromagnetic nterference source.
6.The cross section of wires connecting power must be 0.5mm2-2.5mm2(20-14AWG;75℃(min)).And the current load of the wires shall be 6A.
7.Copper wire (standard or single core cable)can be used.
8.Before testing the equipment,please test the voltage and confirm whether it isproper
Address:CNC High-Tech Hutou Industrial Zone, Liushi Town, Yueqing, Wenzhou Ctity, China